PENGUKURAN EFISIENSI WAKTU KERJA DENGAN JAM HENTI OPERASIONAL PENCUCIAN MOBIL ROBOTIC OTOBILAZ CAR WASH AND DETAILING

Authors

  • Hauzan Abbad Muzakki Teknik Industri Fakultas Teknik, Universitas Bhayangkara Jakarta Raya
  • Raffary Aqilla Teknik Industri Fakultas Teknik, Universitas Bhayangkara Jakarta Raya
  • Muhamad Rifqi Teknik Industri Fakultas Teknik, Universitas Bhayangkara Jakarta Raya
  • Paduloh Teknik Industri Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Keywords:

Steam Car Robotic, Working Time Measurement, Stopwatch Time Study

Abstract

Steam Autobilaz Car Wash & Detailing is located at Jl. Cemara Raya, Jakasampurna, District. West Bekasi, is a company engaged in car washing services with the main service of cleaning cars using robotic steam technology. Robotic car wash is a modern car wash concept with advanced technology. An automated system that uses robots to clean vehicles. Employee activities and performance in the operational process of car washing using steam robot technology greatly influence the time required to manufacture a product or perform a service. In operating the car wash at Steam Otobilaz, it was found that the working time required to wash each car was not optimal. This can be seen from the uncertainty of time in the cleaning process which causes an increase in service time per car and results in a decrease in labor efficiency. So the aim of this research is to study how to calculate standard time based on stopwatch time (stopwatch time study) in the Robotic Car Wash business. The author conducted standard time research directly using the Stop Clock method and to find out how long it takes to complete one manufacturing cycle in Robotic Car Wash operations. Stopwatches are included in the category of working time measurement methods that are directly applied to short, repetitive work. Based on this method, standard time is obtained to increase the efficiency and effectiveness of operational processes. The analysis results show that robot car wash technology is able to reduce operational duration significantly with a standard time of 26.67 minutes, this could be a proposed improvement for the company.

References

Alfin Prahadi, M., Ega Fauzi, D., Rizky, A., & Paduloh, P. (2024). ANALISIS KUALITAS PRODUK SABLON BAJU DILIHAT DARI KUALITAS PELAYANAN DAN KUALITAS PRODUK. Jurnal Inovasi Global, 2(1), 103–107. https://doi.org/10.58344/jig.v2i1.46

Fathwan, A., & Kholidasari, I. (2022). ANALISIS PRODUKTIVITAS BERDASARKAN WAKTU STANDAR DENGAN METODE TIME STUDY DI USAHA MIKRO KECIL DAN MENENGAH (UMKM).

Latief, A., Famalya Melu, P., & Halid Lahay, I. (2021). Pengukuran Waktu Kerja Karyawan pada Pengemasan Es Kristal Menggunakan Metode Time Study. JAMBURA INDUSTRIAL REVIEW Annisa Latief Dkk, 1(2). https://doi.org/10.37905/jirev.1.2.48-57

Melinda, E. (2020). Pengukuran Waktu Standar (Time Study) untuk Meningkatkan Produktivitas Karyawan PT. Aswi Perkasa. Doctoral Dissertation, Universitas Kristen Maranatha.

Pangestu, A. H., Thoriq, M., Al, Q., Abdullah, G., Bhayangkara, U., Raya, J., & Artikel, H. (2023). Analisis Pengendalian Kualitas Produksi Donat Di Toko Donat Madu Cihanjuang Kota Bekasi, Jawa Barat.

Prayuda, S. B. (2020). ANALISIS PENGUKURAN KERJA DALAM MENENTUKAN WAKTU BAKU UNTUK MENINGKATKAN PRODUKTIVITAS KERJA PADA PRODUKSI KERUDUNG MENGGUNAKAN METODE TIME STUDY PADA UKM LISNA COLLECTION DI TASIKMALAYA (Vol. 1, Issue 1).

Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Jurnal Pendidikan Dan Aplikasi Industri (UNISTEK).

Rizani, N. C., Safitri, D. M., & Wulandari, P. A. (2022). PERBANDINGAN PENGUKURAN WAKTU BAKU DENGAN METODE STOPWATCH TIME STUDY DAN METODE READY WORK FACTOR (RWF) PADA DEPARTEMEN HAND INSERT PT. SHARP INDONESIA. JURNAL TEKNIK INDUSTRI, 2(2), 127–136. https://doi.org/10.25105/jti.v2i2.7023

Romadhon, M. S., Nugroho, R. T., & Saputra, Y. (2024). ANALISIS PERAMALAN PENJUALAN SUSU FORMULA DI TOKO SUSU TY-SYAR DENGAN MENGGUNAKAN METODE MOVING AVERAGE. Jurnal Salome: Multidisipliner Keilmuan, 2(1), 117–125.

Rully, T., Rahmawati, N. T., Tri, N., & Mahasiswa, R. (2019). PERENCANAAN PENGUKURAN KERJA DALAM MENENTUKAN WAKTU STANDAR DENGAN METODE TIME STUDY GUNA MENINGKATKAN PRODUKTIVITAS KERJA PADA DIVISI POMPA MINYAK PT BUKAKA TEKNIK UTAMA TBK. Jurnal Ilmiah Manajemen Fakultas Ekonomi, 1(Tahun), 12–18.

Saputra, J., Hafrida, E., & Musri, M. (2022). PENGUKURAN WAKTU KERJA BERBASIS STOPWATCH TIME STUDY DAN ANALISIS KESELAMATAN KESEHATAN KERJA PADA PABRIK TAHU SUKRI BUKIT BATREM DUMAI.

Sutalaksana, I. Z. (2019). Teknik Tata Cara Kerja. Laboratorium Tata Cara Kerja & Ergonomi.

Yudha Pradana, A., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT. XYZ. In Juminten : Jurnal Manajemen Industri dan Teknologi (Vol. 02, Issue 01).

Downloads

Published

2025-01-11 — Updated on 2025-01-13

Versions

Issue

Section

Articles